Shopping Cart

BRT Bus Repair and Refurbishment Project

BRT Bus Repair and Refurbishment Project

Comprehensive bus refurbishment and modernization, including exterior facelift, interior renovation, structural repairs, and complete mechanical and electrical system overhauls.

  • Front and Rear End Facelift
  • Body Panel Repair or Replacement and Complete Repainting
  • Dashboard Refurbishment and Leather Upholstery
  • Design and Installation of GRP Wheel Arch Covers
  • Replacement of All Interior Trim Panels
  • Design and Fabrication of Aluminum Floor and Wall Trims
  • Roof Refurbishment and Installation of a New Lighting System
  • Complete Seat Refurbishment
  • Replacement of Plywood Flooring and Floor Coverings
  • Replacement of Side, Rear, and Front Windows
  • Ramp Refurbishment
  • Replacement of All Lighting Fixtures
  • Refurbishment of Grab Handles and Handrails
  • Complete Engine Overhaul
  • Complete Replacement of Undercarriage Components
  • Complete Transmission Overhaul
  • Electrical Wiring Troubleshooting and Repair

User Comments

User Ratings and Reviews

No ratings have been submitted yet.
No reviews have been submitted for this product yet.

We are with you at any hour of the day or night.

Please submit your inquiries and requests through the form below. We appreciate your communication and will respond promptly.

contact us

+98 (21) 6628 2105

info@railpardaz.com

Next to Kolahdouz Complex 16th Kilometer ,Fath Highway ,Tehran ,IRAN

designed by deepers team

aall copyRight reseved by rail pardaz at 2025